Bullhorn Wasteway Replacement

This wasteway project for Alberta Transportation is located along the Belly River to St. Mary Reservoir Canal near Standoff, AB.  CWP’s scope of work included 1,900 m3 of cast-in place concrete and associated formwork, installation of three radial gates and hoists and installation of a precast concrete vehicle bridge. This included 950 m2 of concrete placed on a 3H:1V slope. In addition CWP performed the concrete works on one downstream road crossing